Toptsis Konstantinos

1.         Surname                                  :           TOPTSIS

2.         Forenames                              :           KONSTANTINOS

3.         Date and place of Birth          :           15-01-1969, Athens, Greece

4.         Nationality                              :           GREEK

5.         Civil Status                             :           MARRIED

 

Permanent Address                : 20, Ploutarchou St. 106 76 Athens, Greece

Contact Address                     : Same as above

Contact Telephone/ fax          : Tel: + 302106746575 / 302106851360

Mobile                                     : +306974660156

Contact e-Mail address          : topcon@teemail.gr

 

6.         Education

 

1. Institution

National Technical University of Athens

Date: From/ to

10/1987 – 07/1992

Qualification

Diploma in Surveying and Agricultural Engineering

2. Institution

Technical Chamber of Greece

Date: From/ to

10/1992 – 12/2006

Qualification

Seminars in Surveying and Infrastructures Engineering

 

7.         Language Skills (marks 1 to 5 for competence):

 

Language

Level

Passive

Spoken

Writing

Greek

1

1

1

1

English

2

2

3

3

 

 

8          Membership of Professional Bodies :

 

  • Member of the Technical Chamber of Greece
  • Registered Consultant with the Ministry of Environment, Planning and Public Works

 

 

9.                  Other Skills/ H&S qualifications:    

 

  • Expert office IT user, with strong mathematical and analytical skills
  • Very familiar with infrastructure development, implementation of public works, structural funds and cohesion policy.
  • Extensive experience in engineering design, preparation of tender documents, cost engineering.

 

 

10.       Present Position:

 

  • Self – Employed Consultant, associate to HYDROMON Consulting Ltd

 

11.       Years of professional Experience:

 

  • 26 Years

 

 

12.       Career Resumé Relevant to This Assignment:

 

  • 22 years of general professional and technical experience in all stages of infrastructure development. Specific demonstrable experience in developing infrastructure projects, assisting in all phases of tendering and implementation as well as extensive experience in programme management, evaluation and monitoring.
  • Experience in development/programming/evaluation of structural interventions financed through public funds and International Institutions (World Bank etc) and since Greece’s membership in the EU, the various Community Support Frameworks for Greece and the Cohesion Fund.

 

13.       Employment Record

 

Dates

Company

Position

1992

Self – Employed

Engineer

2005

present

Associate to Hydromon Consulting Llp

Consulting Engineer

 

 

 

14.              Specific Experience Record

 

Date: from (year) to (year)

Location

Company/ Position/ Client

Brief Description of project

 

 

09/2017

02/2018

 

Macrakomi Municipality

Consultant /

Macrakomi Municipality

 

Giannitsou Municipal Ynity water supply network

infrastructure including detailed engineering design, application preparation for securing funding from the Sterea Hellada Regional Operational Program, in the NSRF for Greece 2014 – 2020.

 

 

06/2017

12/2017

 

North Aegean Region

Chios Island

 

Chios Island, upgrading the island’s transport infrastructure, including technical detailed design, technical structures, bridges and administrative project maturity as well as securing and managing funding from the North Aegean Regional Support Framework for Greece 2014 – 2020.

 

 

02/2016

06/2016

 

ABU DHABI PORT AUTHORITY

 

Project Engineer HYDROMON

CONSULTING Llp

 

Delma Port infrastructure water supply, sewerage, surface water management and irrigation

02/2015

10/2015

 Filothei  Municipal Ynity

Consultant / Municipality of Filothei - Psychico

 

Evaluation and Improvements to the Drainage Network of Municipality of Filothei Municipal Unity,  drainage infrastructure including detailed engineering design, preparation of bidding documents, application preparation for securing funding from the Regional Operational Program of Attiki, in the NSRF for Greece 2014 – 2020.

 

03/2014

06/2015

 

 

Jeddah 4  Industrial City

Saudi Arabia

 

 Project Engineer HYDROMON

CONSULTING Llp

Jeddah 4 Industrial City Infrastructure, including flood protection, water supply, sewerage, surface water management and irrigation

05/2013

09/2015

 

 

Jazan 1 Industrial City

Saudi Arabia

 

Project Engineer HYDROMON

CONSULTING Llp

Jazan 1 Industrial City Infrastructure, including flood protection, water supply, sewerage, surface water management and irrigation

02/2012 10/2015

 

Ministry of Agricultural Development &

Foods

 

Project Engineer HYDROMON

CONSULTING Llp

Tolofonas Dam in Charmisko and Irrigation Works Study, earthdam design, 35,0 high and 280,0 long, water intake and 3,8 km irrigation water supply, 400 and 200 m3 irrigation reservoirs 

09/2009 12/2009

Municipality of Psychico

 

HYDROMON

CONSULTING Llp / Project Engineer

 

 

Evaluation and Improvements to the Drainage Network of Municipality of Psychico,  drainage infrastructure including detailed engineering design, preparation of bidding documents, application preparation for securing funding from the Regional Operational Program of Attiki, in the NSRF for Greece 2007 – 2013.

 

05/2005

07/2007

 

East Attiki Greece

HYDROMON

CONSULTING Llp / Project Engineer

 

 

Flood Protection Study of Oropos 1st Geographical District, Outline and detailed Design, torrent regulation and control, flood protection works, small dams, embankments, technical works, environmental assessment, socio-economic evaluation, bidding documents. The project is funded through the 3rd Community Support Framework for Greece 2000 – 2006.

10/2003

04/2005

Chios

Greece

HYDROMON

CONSULTING Llp / Project Engineer

 

 

Prefecture of Chios Island, upgrading the island’s transport infrastructure, including technical (preliminary, outline and detailed design, technical structures, bridges) and administrative project maturity as well as securing and managing funding. Most sub-projects were funded through the 3rd Community Support Framework for Greece 2000 – 2006, and more are proposed for the 4th Programming Period 2007 – 2013

 

 

 

 

10/2001

07/2007

Leros

Greece

HYDROMON

CONSULTING Llp / Project Engineer

 

 

Municipality of Leros Island, upgrading the island’s sanitary infrastructure (including Networks Outline and Detailed Design, Sewage Treatment Plant Design, Static control of Pumping Stations & Reservoirs, Electromechanical study of pumping stations, Structures). The project is funded through the 3rd Community Support Framework for Greece 2000 – 2006 and the Cohesion Fund.

 

The work included securing funding through the Cohesion Fund and the North Aegean Regional OP as well as assisting through to procurement and implementation.

 

10/1998 12/2010

Athens, Greece

HYDROMON

CONSULTING Llp / Project Engineer

 

Municipality of Marcopoulo, Development and implementation of the Marcopoulo and Porto Rafti Coastal Zone sanitary infrastructure including detailed engineering design, preparation of bidding documents, application preparation for securing funding from Cohesion Fund and the Regional Operational Program of Attiki, in the 3rd Community Support Framework for Greece 2000 – 2006.

 

07/2003 09/2004

Delphi Greece

HYDROMON

CONSULTING Llp / Project Engineer

 

 

Municipality of Delphi. Engineering design, securing funding, assisting in tendering and project management of the Delphi water supply network, including performing an environmental impact assessment, funded through the Regional OP of Sterea Ellada in the 3rd Community Support Framework for Greece 2000 – 2006