CURRICULUM
VITAE
1. |
Surname : |
Kolliniatis |
2. |
NAME : |
IOANNIS |
3. |
Date of
birth – PLACE : |
FEBRUARY
20, 1949 – |
4. |
ΥΠΗΚΟΟΤΗΤΑ : |
HELLENIC |
5. |
ΟΙΚΟΓΕΝΕΙΑΚΗ ΚΑΤΑΣΤΑΣΗ : |
MARRIED – 2 CHILDREN |
6. |
ΕΚΠΑΙΔΕΥΣΗ : |
HIGHER
EDUCATION |
Institution : |
Faculty of Civil Engineering, |
Date : |
1972 |
Diploma : |
Master
of Science in Civil Engineering |
7. |
Language SKILLS:
(Indicate competence on a scale of 1 to 5, 5-excellent): |
||||
|
Speaking
|
Writing
|
|
||
Greek
|
5 |
5 |
5 |
|
|
English |
5 |
3 |
4 |
|
|
8. |
MEMBERSHIPS AT PROFESSIONAL BODIES |
|
Technical
Chamber of |
|
Registered Consultant with the Ministry of Environment,
Planning and Public Works |
|
Hellenic Society of Civil Engineers |
|
Consultants |
|
Greek Commission on Large Dams |
9. |
Present POSITION : |
|
Founder of OMITEM Consulting Engineers S.A., main shareholder and Managing Director of the firm. Responsible for hydraulic and structural designs. |
10. |
YEARS OF PROFESSIONAL EXPERIENCE : |
|
Forty
One (41) |
11. |
MAIN COMPETENCIES : |
|
Study
and Design of Hydraulic works |
|
Study
and Design of Structural works |
12. |
Professional Experience
|
Date (from – to) : |
2002 - 2016 |
Location : |
|
Company – Service : |
OMITEM
Consulting Engineers S.A. Address: 31 Chlois st, GR 15125, Tel : +30210 6147230, Fax: +30210 6147230, email: info@omitem.gr Greek Consultancy Register No. 645, for 6 categories
of projects : 1st category : 06 (Architectural),
class: Α 2nd category : 08 (Structural),
class: Ε 3rd category : 11 (Maritime), class: Β 4th category : 13 (Hydraulic), class: Ε 5th category : 21 (Geotechnical), class:
Β 6th category : 27(Environmental),
class: Β |
Position : |
Partner, Chairman
of the Board of Directors & C.E.O. |
Responsibilities : |
Representative of the firm, Project Manager for Hydraulic and Structural
designs |
|
|
Date (from – to) : |
1980-2002 |
Location : |
|
Company – Service : |
“I. P. KOLLINIATIS” |
Position : |
Representative of the firm |
Responsibilities : |
Representative of the firm, Project Manager for Hydraulic and Structural designs |
|
|
Date (from – to) : |
1975-1979 |
Location : |
|
Company – Service : |
E.N.M. Consulting Engineers Ltd. |
Position : |
Associate |
Responsibilities : |
Project Manager for
Hydraulic and Structural designs |
|
|
Date (from – to) : |
1973-1975 |
Location : |
|
Company – Service : |
Hellenic Air Force - Military Service |
Position : |
Second Lieutenant Reserve Officer |
Responsibilities : |
Chief Engineer of
Survey workgroup for O.S.M.A.A., responsible for the topographic mapping and
then as Head of Office of Aviation Maintenance Base in fuel storage and
pumping facilities. |
13. |
OVERVIEW OF RELEVANT PROFESSIONAL EXPERIENCE OF THE LAST 25 YEARS
|
||
COUNTRY |
DATE |
Brief Description of project / Position and Responsibilities |
|
|
2008 – 2017 |
Study of flood protection system
for the Complex of streams: Tholos - Nea Petra, Sisamia,
Kastrolakkas / Project Manager for
Hydraulic designs |
|
|
2008 – 2017 |
Study of Kireas river training
works / Project Manager for Hydraulic
designs |
|
|
2008 – 2012 |
Study of Sewage Network and Wastewater
Treatment Plant of Vocha / In charge of Hydraulic
design |
|
GREECE |
2008 – 2011 |
Study of Stormwater Network,
Sewage Network and Wastewater Treatment Plant for Chora, Ampelofyto &
Koryfasio Municipalities In charge of Hydraulic
design |
|
GREECE |
2004-2007 |
Hydrulic Study for Completion of Stavros - Project Manager for
Hydraulic designs |
|
|
2007 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the hotel complex
«GALINI BEACH SA" at Nidri, Lefkada (1,000 pe) Project Manager for
Hydraulic designs |
|
|
2006-2007 |
Egnatia Odos / Isles Department: Section
N01.00 - N03.00 - "Study of sewage network reconstruction for Gavrio, Andros
Island and Study for the reconstruction of three (3) km of pipeline of the external
aqueduct at Tinos Island from Mt Tsiknias" (Contract No. 2551/A01,
Reference Number: 01) Project Manager for
Hydraulic designs |
|
|
2007 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the hotel
complex "ALMIRIDA BEACH SA" in Almyrida, Apokoronas (400 pe
expansion unit) Project Manager for Hydraulic designs |
|
GREECE |
2006 |
Egnatia Odos / Final update of Hydraulics
study of the section: Eastern abutment of river Nestos' bridge to the inlet
of the tunnel Fytias (between chainage 24+300 km to 496+25 km) and Final
Hydraulic Study of Thalassia junction (chainage 25+345 km) (Contract No. 0000-00VA/A1436/A01 / 01.04.2003, Order
Number 07) Project Manager for Hydraulic designs |
|
|
2005-2006 |
Egnatia Odos / Detailed Study of
Hydaulic works for the Anilio tunnel (Section 3.2 - 3.5.2) Project Manager for
Hydraulic designs |
|
|
2006 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the hotel
complex " ANASTASIA RESORT - NEILSON HELLAS Project Manager for
Hydraulic designs |
|
|
2005-2006 |
Egnatia Odos / Hydraulic Design of
temporary and permanent works for the protection of the piers of river Nestos'
bridge and Updating of the approved Hydraulic design of the Old National
Highway Kavala-Xanthi (chainage 23+000 km to 25+496 km) (Contract No. A1436, Order Number
06) Project Manager for
Hydraulic designs |
|
|
2006 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the hotel
complex " ASTERAS PARADISE SA" at the Asteras, Project Manager for Hydraulic designs |
|
|
2005-2006 |
Preliminary Hydraulic Study of Erasinos
stream training works in Attica, Mesogea In charge of Hydraulic
design |
|
|
2004-2006 |
Egnatia Odos / Final Hydraulic
Study for Section 1.3.1. St. Anastasia-Dodona. (Drainage - training works) between
chainage 1+580 km to 4+100 km (Contract No. A1436, Order Number
02) Project Manager for
Hydraulic designs |
|
|
2004-2005 |
Final Hydraulic Study (Drainage - training
works) of Rendina interchange at chainage 22+265 km (Section 11.1) (Contract No. A1436, Order Number
03a) In
charge of Hydraulic design |
|
|
2006 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the hotel
complex "SOT. SPILIOTEAS & Sons'
Kardamili, Messinia (150 pe) Project Manager for
Hydraulic designs |
|
GREECE |
2004-2005 |
Hydraulic Study for Completion of Stavros - (Contract No.: KO 02/06) Project Manager for Hydraulic designs |
|
|
04/2003 - 03/2006 |
Ergose / Preliminary Hydraulic
Study for the connection of the New Corintos - Patras Railway with the existing
rail line to Pirgos (Contract No. 399) Project Manager for
Hydraulic designs |
|
|
2006 |
Final Study for Contractor's bid
for the construction of the Wastewater Treatment Plant of (Consortium: Saitas Nikolaos - Gkigkelos Sotiris - Trouvas
Ioannis) Project Manager for
Hydraulic designs |
|
|
2005 |
Egnatia Odos / Final Study for the
training works of river Metsovitikos (Section
3.1) In charge of Hydraulic
design |
|
|
2005 |
Ergose / Part of the Hydraulic
Study for the section Leptokaria - Katerini" In charge of Hydraulic
design |
|
|
2005 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the hotel
complex "KELEPOURI IOULIA" in Agios Nikolaos, Messinia (150 pe) Project Manager for
Hydraulic designs |
|
GREECE |
2005 |
Final Hydraulic Design for the Fishing
Shelter of Sabatiki In charge of Hydraulic
design |
|
GREECE |
2005 |
Part of the Hydraulic Study for
the works of water conveyance and distribution from Karla lake In charge of Hydraulic
design |
|
GREECE |
2005 |
Final Design for the Rehabilitation
of damages of the Bridge of Koklama in Iraia Municipality In charge of Hydraulic
design |
|
|
2005 |
Part of Hydraulic Study for the
sewage network of In charge of Hydraulic
design |
|
|
2003-2004 |
Design of Hydraulic Works for the
small hydroelectric plant of Kerasovo In charge of Hydraulic
design |
|
|
2003-2004 |
Egnatia Odos / Preliminary Flood
Protection Study for the settlements of Parikia and Naoussa, Paros Island (Contract
No. A1436, Order Number 01) Project Manager for
Hydraulic designs |
|
|
2003-2004 |
Detailed Hydraulic Study for the
training works of Inoi stream Project Manager for
Hydraulic designs |
|
|
2004 |
Egnatia Odos / Part of the Final
Hydraulic Study for the drainage works of Polidendri - Pente Vrises road In charge of Hydraulic
design |
|
|
2003-2004 |
Final Hydraulic Study for Completion
of Stavros - Project Manager for Hydraulic
designs |
|
|
2004 |
Egnatia Odos / Final Hydraulic
Study (drainage - training works) of Panagia junction (Section 4.1.1) between
chainage 5+900 km to 7+200 km (Contract No. A1436, Order Number
04) Project Manager for
Hydraulic designs |
|
|
2004 |
Egnatia Odos / Part of Hydraulic Study
of rehabilitation works for the diversion of Lykopodi stream In charge of Hydraulic
design |
|
|
2004 |
Final Study for the protection
works of the abutments of Gadoura dam, Rodos island In charge of Hydraulic
design |
|
GREECE |
2004 |
Part of the Preliminary Hyraulic Study
for the the small hydroelectric plant of Kyprinos at Arda Dam In charge of Hydraulic
design |
|
GREECE |
2004 |
Part of the Preliminary Hydraulic Study
for the upgrade works of railroad section Inoi - Chalkida In charge of Hydraulic
design |
|
|
2003 |
Part of the Hydraulic Study on the
intake and evacuation works of Gadoura Dam, Rodos island In charge of Hydraulic
design |
|
|
2003 |
Detailed Study for Contractor's
bid for the construction of the Wastewater Treatment Plant of the camping
site "D.KAVADA BROS" at Vlychos, Lefkada (400 pe) Project Manager for
Hydraulic designs |
|
|
2003 |
Part of the Srtuctural Study on
the drainage works of In charge of Hydraulic
design |
|
GREECE |
2001-2004 |
Detailed
Hydraulic Study (flood protection works, drainage works, hydrology study) for
the DEH power plant at Meliti-Achlada (330MW), Florina Project Manager for Hydraulic designs |
|
GREECE |
2001-2002 |
Egnatia
Odos / Hydraulic Study on the Rehabilitation of operational failures of
Krania-Milia road Project Manager for Hydraulic designs |
|
GREECE |
2000-2001 |
Hydraulic Study for the drainage
works of the expansion of the aircraft parking space & runway at Skiathos
National Airfield Project Manager for
Hydraulic designs |
|
GREECE |
1996-2000 |
Final Hydraulic Study on
irrigation works (construction of a new irrigation water conveyance pipeline and
improvements on existing network) at the Project Manager for
Hydraulic designs |
|
GREECE |
1998-2000 |
Final
Hydraulic Study for the drainage works of the Antirrio - (Chinage
from 0+00 km to 34+300 km) Project Manager for Hydraulic designs |
|
GREECE |
1999 |
Hydraulic Study for the flood
protection works of the DEH steam powered power plant of Atherinolakos Project Manager for
Hydraulic designs |
|
GREECE |
1998 |
Preliminary Hydraulic Study for the drainage works
of Kalampaka - Ioannina railroad Project Manager for Hydraulic designs |
|
GREECE |
1998 |
Hydraulic Study of the supplementary wastewater
treatment plant of the Project Manager for Hydraulic designs |
|
GREECE |
1997-1999 |
Hydraulic
Study and Topographic Survey for the construction of a dam at the Project Manager for Hydraulic designs |
|
GREECE |
1997 |
Final Hydraulic Study for the drainage works of a
new maneuvering area at the National Airfield of Project Manager for Hydraulic designs |
|
GREECE |
1994 |
Update of the Final Hydraulic Study for the drainage
works of the maneuvering area at the National Airfield of Project Manager for Hydraulic designs |
|
GREECE |
1992-1995 |
Consulting services for the preparation of bid
documents for the construction of a park at Pirgos Vasilissis, Project Manager for Hydraulic designs |
|
GREECE |
1995 |
Part of the Preliminary Hydraulic
Study for the drainage works of Athina - In charge of Hydraulic
design |
|
GREECE |
1995 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic design |
|
GREECE |
1995 |
Part of the Hydraulic Study of a
dam at Tsiknia, In charge of Hydraulic
design |
|
GREECE |
1995 |
Part of the Final Hydraulic Study
of Karla reservoir and relavant works In charge of Hydraulic
design |
|
GREECE |
1995 |
Final Hydraulic Study for the
sewage network and Preliminary Hydraulic Study for the wastewater treatment
plant of In charge of Hydraulic
design |
|
GREECE |
1994 |
Parts of
the Preliminary Hydraulic Study, parts of the Final Hydraulic Study and
preparation of tender documents for sewage networks and Preliminary Hydraulic
Study for storm water networks in parts of the Municipalities of Kropia,
Paiania, Spata, Anthousa, Gerakas, Glyka Nera, Penteli, Pallini, Pikermi,
Artemida, Rafina, Nea Makri and Marathonas In
charge of Hydraulic design |
|
GREECE |
1993 |
Final Hydraulic Study for an earthfill dam (40m) at
Livadi, Larissa Project Manager for Hydraulic designs |
|
GREECE |
1990-1992 |
Part of
the Final Hydraulic Study for irrigation works (Zones In
charge of Hydraulic design |
|
GREECE |
1992 |
Part of
the Final Hydraulic Study for an earthfill dam (29m) for irrigation purposes
at Metaksochori, Kilkis In
charge of Hydraulic design |
|
GREECE |
1992 |
Part of
the Hydraulic Study for the Environmental impact assessment of works at the
horse racing track and athletic center of Kalochori, Thessaloniki In
charge of the hydraulic study |
|
GREECE |
1992 |
Final Hydraulic Study for Contractor's bid for a wastewater treatment
plant at (Consortium: D. Starras - N.
Andritsopoulos) Project Manager for Hydraulic designs |
|
GREECE |
1992 |
Part of
the Preliminary Hydraulic Study for an earthfill dam (37m) for irrigation and
water supply at Faneromeni, In
charge of Hydraulic design |
|
GREECE |
1992 |
Hydraulic
Study for the Environmental impact assessment of works at the horse racing
track, marina and hotel complex at Anavyssos, Attiki Project
Manager for Hydraulic designs |
|
GREECE |
1990-1992 |
Part of
the Final Hydraulic Study for an rockfill dam (45m) for irrigation and water
supply purposes at Tsikalaria, In
charge of Hydraulic design |
|
GREECE |
1992-1993 |
Detail Hydraulic Study for the stormwater and
drainage works for parts of (Contract No. 9071542) Project Manager for Hydraulic designs |
|
GREECE |
1991 |
Final Hydraulic Study for the irrigation of slopes and
traffic islands for parts of Project Manager for
Hydraulic designs |
|
GREECE |
1991 |
Final Hydraulic Study for the irrigation of slopes and
traffic islands for parts of Project Manager for
Hydraulic designs |
|
GREECE |
1991 |
Final Hydraulic Study for the irrigation of slopes and
traffic islands for parts of Project Manager for
Hydraulic designs |
|
GREECE |
1991 |
Update of the Final Hydraulic Study for an earthfill dam (19m) at Lofos, Larissa Project Manager for
Hydraulic designs |
|
GREECE |
1991 |
Hydraulic
Study for the Environmental impact assessment of wastewater treatment plant
works at a tourist area in Project Manager for
Hydraulic Study |
|
GREECE |
1991 |
Final Hydraulic Study for
Contractor's bid for the construction of the wastewater treatment plant of
Benitses prefecture, Corfu (Consortium: D. Starras - N.
Andritsopoulos) Project Manager for Hydraulic Study |
|
GREECE |
1991 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic
design |
|
GREECE |
1991 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic
design |
|
GREECE |
1991 |
Final Hydraulic Study for
Contractor's bid for the construction of the wastewater treatment plant of
Tolo prefecture (15.000ep) (Consortium: D. Starras - N.
Andritsopoulos) Project Manager for Hydraulic Study |
|
GREECE |
1991 |
Final Hydraulic Study for
Contractor's bid for the construction of the wastewater treatment plant of (Consortium: D. Starras - N.
Andritsopoulos) Project Manager for Hydraulic Study |
|
GREECE |
1990 |
Final Hydraulic Study for
Contractor's bid for the construction of the wastewater treatment plant of (Consortium: D. Starras - N.
Andritsopoulos) Project Manager for Hydraulic Study |
|
GREECE |
1990 |
Part of the
Final Hydraulic Study for sewage networks and training works of streams at
Perea, Agia Triada at In charge of Hydraulic
design |
|
GREECE |
1990 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic
design |
|
GREECE |
1990 |
Parts of the
Final Hydraulic Study for the diversion channel of Diakoniari stream to
Glafkos river, Patra In charge of Hydraulic
design |
|
|
1990 |
Parts of the
Studies for the restructuring of the wastewater and solid waste treatment system
of Tremiti islands, In charge of Hydraulic
design |
|
GREECE |
1989 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic
design |
|
GREECE |
1989 |
Final Hydraulic Study for the drainage works of the
maneuvering area at the National Airfield of Project
Manager for Hydraulic designs |
|
GREECE |
1989 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic
design |
|
GREECE |
1989 |
Parts of the Final Hydraulic Study
for the works of sewage networks in areas of Patras In charge of Hydraulic
design |
|
GREECE |
1988-1992 |
Parts of
the Final Hydraulic Study for the irrigation network system at Mati,
Tirnavos, Larissa In
charge of Hydraulic design
|
|
GREECE |
1988 |
Part of the Final Hydraulic Study
for the design of stormwater and sewage networks of parts In charge of Hydraulic
design |
|
GREECE |
1988 |
Part of
the Final Hydraulic Study for an earthfill dam (34m) for irrigation purposes
at the In charge of Hydraulic
design |
|