Kolliniatis Ioannis

CURRICULUM VITAE

 

1.

Surname :

Kolliniatis

2.

NAME :

IOANNIS

3.

Date of birth – PLACE :

FEBRUARY 20, 1949 PIRAEUS, GREECE

4.

ΥΠΗΚΟΟΤΗΤΑ :

HELLENIC

5.

ΟΙΚΟΓΕΝΕΙΑΚΗ ΚΑΤΑΣΤΑΣΗ :

MARRIED – 2 CHILDREN

6.

ΕΚΠΑΙΔΕΥΣΗ :

HIGHER EDUCATION

 

Institution :

Faculty of Civil Engineering,

National Technical University of Athens (NTUA)                                          

Date :

1972

Diploma :

Master of  Science in Civil Engineering

 

7.

Language SKILLS:  (Indicate competence on a scale of 1 to 5, 5-excellent):

Language

Reading
Speaking
Writing

 

Greek

5

5

5

 

English

5

3

4

 

 

8.

MEMBERSHIPS AT PROFESSIONAL BODIES

 

Technical Chamber of Greece

 

Registered Consultant with the Ministry of Environment, Planning and Public Works

 

Hellenic Society of Civil Engineers

 

Consultants Union of Hydraulic Works

 

Greek Commission on Large Dams

 

9.

Present POSITION :

 

Founder of OMITEM Consulting Engineers S.A., main shareholder and Managing Director of the firm. Responsible for hydraulic and structural designs.

 

 

10.

YEARS OF PROFESSIONAL EXPERIENCE :

 

Forty One (41)

 

11.

MAIN COMPETENCIES :

 

Study and Design of Hydraulic works

 

Study and Design of Structural works

 

 

 


12.

Professional Experience

 

Date (from – to) :

2002 - 2016

Location :

Greece

Company – Service :

OMITEM Consulting Engineers S.A.

Address: 31 Chlois st, GR 15125, MAROYSSI-ATHENS GREECE

Tel : +30210 6147230, Fax: +30210 6147230,

email: info@omitem.gr

Greek Consultancy Register No. 645, for 6 categories of projects :

1st category : 06 (Architectural), class: Α

2nd category : 08 (Structural), class: Ε

3rd category : 11 (Maritime), class: Β

4th category : 13 (Hydraulic), class: Ε

5th category : 21 (Geotechnical), class: Β

6th category : 27(Environmental), class: Β

Position :

Partner, Chairman of the Board of Directors & C.E.O.

Responsibilities :

Representative of the firm, Project Manager for Hydraulic and Structural designs

 

 


Date (from – to) :

1980-2002

Location :

Greece

Company – Service :

I. P. KOLLINIATIS”

Position :

Representative of the firm

Responsibilities :

Representative of the firm, Project Manager for Hydraulic and Structural designs

 

 


Date (from – to) :

1975-1979

Location :

Greece

Company – Service :

E.N.M. Consulting Engineers Ltd.

Position :

Associate

Responsibilities :

Project Manager for Hydraulic and Structural designs

 

 


Date (from – to) :

1973-1975

Location :

Greece

Company – Service :

Hellenic Air Force - Military Service

Position :

Second Lieutenant Reserve Officer

Responsibilities :

Chief Engineer of Survey workgroup for O.S.M.A.A., responsible for the topographic mapping and then as Head of Office of Aviation Maintenance Base in fuel storage and pumping facilities.

 

13.

OVERVIEW OF RELEVANT PROFESSIONAL EXPERIENCE OF THE LAST 25 YEARS

COUNTRY

DATE

Brief Description of project / Position and Responsibilities

                  

GREECE

2008 – 2017

Study of flood protection system for the Complex of streams:

Tholos - Nea Petra, Sisamia, Kastrolakkas / Serres Prefecture

Project Manager for Hydraulic designs

GREECE

2008 – 2017

Study of Kireas river training works / Prefecture of Evia

Project Manager for Hydraulic designs             

GREECE

 

2008 – 2012

 

Study of Sewage Network and Wastewater Treatment Plant of Vocha / Prefecture of Korinthos

In charge of Hydraulic design

GREECE

 

2008 – 2011

 

Study of Stormwater Network, Sewage Network and Wastewater Treatment Plant for Chora, Ampelofyto & Koryfasio Municipalities

In charge of Hydraulic design

GREECE

2004-2007

Hydrulic Study for Completion  of Stavros - Lavrion Highway / Section: Keratea - Lavrion / Subsection: IIb (D.E.H junction to French Strorage Facilities junction), Project No.: KO 02/06

Project Manager for Hydraulic designs             

GREECE

2007

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the hotel complex «GALINI BEACH SA" at Nidri, Lefkada (1,000 pe)

Project Manager for Hydraulic designs

GREECE

2006-2007

Egnatia Odos / Isles Department: Section N01.00 - N03.00 - "Study of sewage network reconstruction for Gavrio, Andros Island and Study for the reconstruction of three (3) km of pipeline of the external aqueduct at Tinos Island from Mt Tsiknias" (Contract No. 2551/A01, Reference Number: 01)

Project Manager for Hydraulic designs

GREECE

2007

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the hotel complex "ALMIRIDA BEACH SA" in Almyrida, Apokoronas (400 pe expansion unit)

Project Manager for Hydraulic designs

GREECE

2006

Egnatia Odos / Final update of Hydraulics study of the section: Eastern abutment of river Nestos' bridge to the inlet of the tunnel Fytias (between chainage 24+300 km to 496+25 km) and Final Hydraulic Study of Thalassia junction (chainage 25+345 km)

(Contract No. 0000-00VA/A1436/A01 / 01.04.2003, Order Number 07)

Project Manager for Hydraulic designs

GREECE

2005-2006

Egnatia Odos / Detailed Study of Hydaulic works for the Anilio tunnel (Section 3.2 - 3.5.2)

Project Manager for Hydraulic designs

GREECE

2006

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the hotel complex " ANASTASIA RESORT - NEILSON HELLAS S.A." in Nea Sikeona, Chalkidiki (300 pe compact unit)

Project Manager for Hydraulic designs

GREECE

2005-2006

Egnatia Odos / Hydraulic Design of temporary and permanent works for the protection of the piers of river Nestos' bridge and Updating of the approved Hydraulic design of the Old National Highway Kavala-Xanthi (chainage 23+000 km to 25+496 km)

(Contract No. A1436, Order Number 06)

Project Manager for Hydraulic designs

GREECE

2006

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the hotel complex " ASTERAS PARADISE SA" at the Asteras, Paros (200 pe compact unit)

Project Manager for Hydraulic designs         

GREECE

2005-2006

Preliminary Hydraulic Study of Erasinos stream training works in Attica, Mesogea

In charge of Hydraulic design

GREECE

2004-2006

Egnatia Odos / Final Hydraulic Study for Section 1.3.1. St. Anastasia-Dodona. (Drainage - training works) between chainage 1+580 km to 4+100 km

(Contract No. A1436, Order Number 02)

Project Manager for Hydraulic designs

GREECE

2004-2005

Final Hydraulic Study (Drainage - training works) of Rendina interchange at chainage 22+265 km (Section 11.1)

(Contract No. A1436, Order Number 03a)

In charge of Hydraulic design       

GREECE

2006

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the hotel complex "SOT. SPILIOTEAS & Sons' Kardamili, Messinia (150 pe)

Project Manager for Hydraulic designs

GREECE

2004-2005

Hydraulic Study for Completion  of Stavros - Lavrion Highway / Section: Keratea - Lavrion / Subsection: III

(Contract No.: KO 02/06)

Project Manager for Hydraulic designs       

GREECE

04/2003

-

03/2006

Ergose / Preliminary Hydraulic Study for the connection of the New Corintos - Patras Railway with the existing rail line to Pirgos (Contract No. 399)

Project Manager for Hydraulic designs             

GREECE

2006

Final Study for Contractor's bid for the construction of the Wastewater Treatment Plant of Davlia Municipality (6.000pe)

(Consortium: Saitas Nikolaos - Gkigkelos Sotiris - Trouvas Ioannis)

Project Manager for Hydraulic designs

GREECE

2005

Egnatia Odos / Final Study for the training works of river Metsovitikos  (Section 3.1)

In charge of Hydraulic design             

GREECE

2005

Ergose / Part of the Hydraulic Study for the section Leptokaria - Katerini"

In charge of Hydraulic design

GREECE

2005

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the hotel complex "KELEPOURI IOULIA" in Agios Nikolaos, Messinia (150 pe)

Project Manager for Hydraulic designs

GREECE

2005

Final Hydraulic Design for the Fishing Shelter of Sabatiki

In charge of Hydraulic design

GREECE

2005

Part of the Hydraulic Study for the works of water conveyance and distribution from Karla lake

In charge of Hydraulic design

GREECE

2005

Final Design for the Rehabilitation of damages of the Bridge of Koklama in Iraia Municipality

In charge of Hydraulic design

GREECE

2005

Part of Hydraulic Study for the sewage network of Corfu city

In charge of Hydraulic design

GREECE

2003-2004

Design of Hydraulic Works for the small hydroelectric plant of Kerasovo

In charge of Hydraulic design

GREECE

2003-2004

Egnatia Odos / Preliminary Flood Protection Study for the settlements of Parikia and Naoussa, Paros Island

(Contract No. A1436, Order Number 01)

Project Manager for Hydraulic designs

GREECE

2003-2004

Detailed Hydraulic Study for the training works of Inoi stream

Project Manager for Hydraulic designs

GREECE

2004

Egnatia Odos / Part of the Final Hydraulic Study for the drainage works of Polidendri - Pente Vrises road

In charge of Hydraulic design

GREECE

2003-2004

Final Hydraulic Study for Completion  of Stavros - Lavrion Highway / Section: Keratea - Lavrion / Subsection: IIIa

Project Manager for Hydraulic designs             

GREECE

2004

Egnatia Odos / Final Hydraulic Study (drainage - training works) of Panagia junction (Section 4.1.1) between chainage 5+900 km to 7+200 km

(Contract No. A1436, Order Number 04)

Project Manager for Hydraulic designs                            

GREECE

2004

Egnatia Odos / Part of Hydraulic Study of rehabilitation works for the diversion of Lykopodi stream

In charge of Hydraulic design

GREECE

2004

Final Study for the protection works of the abutments of Gadoura dam, Rodos island

In charge of Hydraulic design

GREECE

2004

Part of the Preliminary Hyraulic Study for the the small hydroelectric plant of Kyprinos at Arda Dam

In charge of Hydraulic design

GREECE

2004

Part of the Preliminary Hydraulic Study for the upgrade works of railroad section Inoi - Chalkida

In charge of Hydraulic design

GREECE

2003

Part of the Hydraulic Study on the intake and evacuation works of Gadoura Dam, Rodos island

In charge of Hydraulic design

GREECE

2003

Detailed Study for Contractor's bid for the construction of the Wastewater Treatment Plant of the camping site "D.KAVADA BROS" at Vlychos, Lefkada (400 pe)

Project Manager for Hydraulic designs

GREECE

2003

Part of the Srtuctural Study on the drainage works of Volos - Larissa diversion, Larissa - Krafsidona interchange

In charge of Hydraulic design

GREECE

2001-2004

Detailed Hydraulic Study (flood protection works, drainage works, hydrology study) for the DEH power plant at Meliti-Achlada (330MW), Florina

Project Manager for Hydraulic designs

GREECE

2001-2002

 

Egnatia Odos / Hydraulic Study on the Rehabilitation of operational failures of Krania-Milia road

Project Manager for Hydraulic designs

GREECE

2000-2001

Hydraulic Study for the drainage works of the expansion of the aircraft parking space & runway at Skiathos National Airfield

Project Manager for Hydraulic designs

GREECE

1996-2000

 

Final Hydraulic Study on irrigation works (construction of a new irrigation water conveyance pipeline and improvements on existing network) at the prefecture of Petra, Viotia

Project Manager for Hydraulic designs

GREECE

1998-2000

Final Hydraulic Study for the drainage works of the Antirrio - Ioannina National Highway, from Antirrio to Amfilochia exit

(Chinage from 0+00 km to 34+300 km)

Project Manager for Hydraulic designs

GREECE

1999

Hydraulic Study for the flood protection works of the DEH steam powered power plant of Atherinolakos

Project Manager for Hydraulic designs

GREECE

1998

Preliminary Hydraulic Study for the drainage works of Kalampaka - Ioannina railroad

Project Manager for Hydraulic designs

GREECE

1998

Hydraulic Study of the supplementary wastewater treatment plant of the prefecture of Petra, Viotia

Project Manager for Hydraulic designs

GREECE

1997-1999

Hydraulic Study and Topographic Survey for the construction of a dam at the prefecture of Petra, Viotia

Project Manager for Hydraulic designs

GREECE

1997

Final Hydraulic Study for the drainage works of a new maneuvering area at the National Airfield of Paros island

Project Manager for Hydraulic designs

GREECE

1994

Update of the Final Hydraulic Study for the drainage works of the maneuvering area at the National Airfield of Ikaria island

Project Manager for Hydraulic designs

GREECE

1992-1995

Consulting services for the preparation of bid documents for the construction of a park at Pirgos Vasilissis, Athens (potable water, sewage, stormwater and irrigation networks, wastewater treatment works)

Project Manager for Hydraulic designs

GREECE

1995

Part of the Preliminary Hydraulic Study for the drainage works of Athina - Thessaloniki High Speed Railroad (between chainage 399 km to 410 km)

In charge of Hydraulic design

GREECE

1995

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at Taratsa and Gouva areas) and drainage works of the western ring road at Galaneika

In charge of Hydraulic design             

GREECE

1995

Part of the Hydraulic Study of a dam at Tsiknia, Lesvos

In charge of Hydraulic design

GREECE

1995

Part of the Final Hydraulic Study of Karla reservoir and relavant works

In charge of Hydraulic design

GREECE

1995

Final Hydraulic Study for the sewage network and Preliminary Hydraulic Study for the wastewater treatment plant of Vilia Municipality

In charge of Hydraulic design

GREECE

1994

Parts of the Preliminary Hydraulic Study, parts of the Final Hydraulic Study and preparation of tender documents for sewage networks and Preliminary Hydraulic Study for storm water networks in parts of the Municipalities of Kropia, Paiania, Spata, Anthousa, Gerakas, Glyka Nera, Penteli, Pallini, Pikermi, Artemida, Rafina, Nea Makri and Marathonas

In charge of Hydraulic design

GREECE

1993

Final Hydraulic Study for an earthfill dam (40m) at Livadi, Larissa

Project Manager for Hydraulic designs             

GREECE

1990-1992

Part of the Final Hydraulic Study for irrigation works (Zones SX, GA, GD) within the basin of Feneos, Korinthos

In charge of Hydraulic design

GREECE

1992

Part of the Final Hydraulic Study for an earthfill dam (29m) for irrigation purposes at Metaksochori, Kilkis

In charge of Hydraulic design

GREECE

1992

Part of the Hydraulic Study for the Environmental impact assessment of works at the horse racing track and athletic center of Kalochori, Thessaloniki

In charge of the hydraulic study

GREECE

1992

Final Hydraulic Study for Contractor's bid for a wastewater treatment plant at Tirnavos Municipality

(Consortium: D. Starras - N. Andritsopoulos)

Project Manager for Hydraulic designs

GREECE

1992

Part of the Preliminary Hydraulic Study for an earthfill dam (37m) for irrigation and water supply at Faneromeni, Naxos island

In charge of Hydraulic design

GREECE

1992

Hydraulic Study for the Environmental impact assessment of works at the horse racing track, marina and hotel complex at Anavyssos, Attiki

Project Manager for Hydraulic designs

GREECE

1990-1992

 

Part of the Final Hydraulic Study for an rockfill dam (45m) for irrigation and water supply purposes at Tsikalaria, Naxos island

In charge of Hydraulic design

GREECE

1992-1993

Detail Hydraulic Study for the stormwater and drainage works for parts of Athens - Korinthos Highway (Section: Thiva intersection - Eftaksias)

(Contract No. 9071542)

Project Manager for Hydraulic designs

GREECE

1991

Final Hydraulic Study for the irrigation of slopes and traffic islands for parts of Athens - Korinthos Highway (Section: Giorgos stream - Megara)

Project Manager for Hydraulic designs

GREECE

1991

Final Hydraulic Study for the irrigation of slopes and traffic islands for parts of Athens - Korinthos Highway (Section: Kakia Skala - Kalamaki / Subsection II & III)

Project Manager for Hydraulic designs

GREECE

1991

Final Hydraulic Study for the irrigation of slopes and traffic islands for parts of Athens - Korinthos Highway (Section: Thiva intersection - Eftaksias)

Project Manager for Hydraulic designs

GREECE

1991

Update of the Final Hydraulic Study for an earthfill dam (19m) at Lofos, Larissa

Project Manager for Hydraulic designs

GREECE

1991

Hydraulic Study for the Environmental impact assessment of wastewater treatment plant works at a tourist area in Thessaloniki

Project Manager for Hydraulic Study

GREECE

1991

Final Hydraulic Study for Contractor's bid for the construction of the wastewater treatment plant of Benitses prefecture, Corfu

(Consortium: D. Starras - N. Andritsopoulos)

Project Manager for Hydraulic Study

GREECE

1991

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at Social Housing, Galaneina, Nea Ionia)

In charge of Hydraulic design

GREECE

1991

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at Pagrati, W. Ampliani, Kalivia, Renenia)

In charge of Hydraulic design

GREECE

1991

Final Hydraulic Study for Contractor's bid for the construction of the wastewater treatment plant of Tolo prefecture (15.000ep)

(Consortium: D. Starras - N. Andritsopoulos)

Project Manager for Hydraulic Study

GREECE

1991

Final Hydraulic Study for Contractor's bid for the construction of the wastewater treatment plant of Filiatra Municipality (10.000ep)

(Consortium: D. Starras - N. Andritsopoulos)

Project Manager for Hydraulic Study

GREECE

1990

Final Hydraulic Study for Contractor's bid for the construction of the wastewater treatment plant of Kato Achaia Municipality & Kato Alissos prefecture (20.000ep)

(Consortium: D. Starras - N. Andritsopoulos)

Project Manager for Hydraulic Study

GREECE

1990

Part of the Final Hydraulic Study for sewage networks and training works of streams at Perea, Agia Triada at Thessaloniki

In charge of Hydraulic design

GREECE

1990

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at section I, northern part of E.R.S.L.)

In charge of Hydraulic design

GREECE

1990

Parts of the Final Hydraulic Study for the diversion channel of Diakoniari stream to Glafkos river, Patra

In charge of Hydraulic design

ITALY

1990

Parts of the Studies for the restructuring of the wastewater and solid waste treatment system of Tremiti islands, Italy

In charge of Hydraulic design

GREECE

1989

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at Housing area of Public Employees)

In charge of Hydraulic design

GREECE

1989

Final Hydraulic Study for the drainage works of the maneuvering area at the National Airfield of Ikaria island

Project Manager for Hydraulic designs

GREECE

1989

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at Northern area)

In charge of Hydraulic design

GREECE

1989

Parts of the Final Hydraulic Study for the works of sewage networks in areas of Patras

In charge of Hydraulic design

GREECE

1988-1992

Parts of the Final Hydraulic Study for the irrigation network system at Mati, Tirnavos, Larissa

In charge of Hydraulic design

GREECE

1988

Part of the Final Hydraulic Study for the design of stormwater and sewage networks of parts Lamia city and Kalyvia settlement (works at Evritani, Taratsa, Social Housing compex area)

In charge of Hydraulic design

GREECE

1988

Part of the Final Hydraulic Study for an earthfill dam (34m) for irrigation purposes at the basin of Feneos, Korinthos

In charge of Hydraulic design